2012/2014 Refit

UPDATED 23/7/2014

Hull:

Rigging/Sails

Safety Equipment:

 

Deck/External Equipment:

Instruments/Communications:

Electrical systems:

Other systems:

Bilge before replacing keel bolts

Old keel bolt with rusting square washer

Old keel bolts

New custom made keel bolts

New keel bots in place

Painted bilges

The keel joint cleaned up

The keel joint epoxied and ready for antifouling,

Diesel tank after emptying

Diesel tank cleaned and back in place

Ultrasonic tank monitor sensor fitted.

Engine being removed from boat

Engine totally in bits

Will they remember all the bits?

The engine complete & under test in the workshop

Engine back in place on boat

Sparking 'new' engine.

New very expensive engine supports.

New engine inlet seacock.

Rudder stuffing being renewed

Stuffing box cover

New dinghy hoisted on Solar Arch/Davits & new swim ladder

Dinghy being lowered over the Windpilot from the new solar arch.

Dinghy going into the water.

The fender storage baskets.

The 4 new solar panels.

The new electric furling winches.

It's a tight fit in the engine control compartment!

The new gas box.

The new water heater.

The old bow thruster

The new carpet

The new ammeter/voltmeter panel

The new panel in place.

How difficult can puting together a new dinghy be!

 

Home | Enchantress | 2014+ | 2014+ Blogs | BWR 2009-2011 | Contact | Site Map

This page was last modified on July 23, 2014

Home | Enchantress | 2014+ | 2014+ Blogs | BWR 2009-2011 | Contact | Site Map

Return to News